With five sets of arrays (including a pair of solar water-heating panels), this job was technically complicated to work on.
The scaffolding had to be extended out to the far left to avoid placing pressure on the very delicate tiles and the whole job took around 13 hours to complete. Not an easy one but satisfying to look at it from ground level and say ‘we did that’ at the end!